Lost Soldier has mobilized Lost Soldier Drilling Rig 88 to begin operations on the Found Soldier Federal #1 well
We anticipate the rig will begin drilling out of surface casing shortly. The objective of this well is to drill directionally to the North end of Section 3 to penetrate the Shannon 5 reservoir section. We plan to obtain rock samples in the key producing sections of the well including the Lance and Shannon zones so that future horizontal well completions can be optimized. The well is scheduled to be a producing vertical well from the Shannon 5 reservoir.