We are pleased to introduce our pipeline expansion project, strategically connecting the abundant energy resources of the Wild Mustang Unit to markets in Wyoming as well as points east, west and south. This initiative is designed to enhance energy transportation efficiency and contribute to our energy future.  Our well test indicated that the gas from our first well is pipeline quality, with a high percentage of pure methane.  With this being the case, the gas requires minimal processing on site.  We began commercial negotiations in 2024 to deliver our gas to the market, with first production scheduled for Q3 2025.

Seamless Integration:

Our proposed 5.3-mile 8” connector pipeline will tap in 2025 to an existing 20-inch diameter line which is engineered to handle ~400 Mmcfd (million cubic feet per day) of natural gas.  Our 3-year plan is to construct midstream capacity to fill this line, ensuring a smooth flow of resources from source to destination, as well as delivering first gas to this line, Wild Mustang Midstream will be chartered to provide distribution and sales from the entire Wild Mustang Federal Unit.  This may extend to oil, condensate, natural gas processing or other services as required to provide the connection to markets for the abundant resources yet to be discovered within the unit.

The connector line is scheduled to be completed by mid 2025. The 5.3mi line will allow Lost Soldier to start creating cashflow this year, and to connect into interstate pipeline networks to the south of Wild Mustang Federal Unit.

A Glimpse into the Future:

Wild Mustang Midstream is committed to bringing this project to fruition by Q3-2025. Our dedicated team of experts and engineers is working to ensure that this pipeline not only meets but exceeds the highest industry standards for safety, reliability, and sustainability.  In addition to the connector line, we have begun front end engineering studies to build a gas processing facility on site.  This will ensure that all production can be shipped as market ready gas and liquids to maximize our ability to provide clean natural gas energy.

Our Responsibility:

As stewards of energy transport within and from the Wild Mustang Unit, Wild Mustang Midstream takes its role seriously. We understand the vital role we play in ensuring the seamless movement of energy resources, and we are unwavering in our commitment to doing so safely and efficiently.  Join us in this transformative journey as we create the infrastructure that will power the future of energy supply. At Wild Mustang Midstream, we’re not just building pipelines; we’re building a sustainable energy legacy.